AKER SOLUTIONS

The removal units will treat and de-sulphate seawater for injection into the reservoir to maintain pressure, and control scaling and souring effects in the reservoir.
P-58 will operate on the Parque das Baleias (Baleia Azul) field located offshore in Espírito Santo state coast. P-62 will operate in module 4 of the Roncador field located in the Campos Basin offshore in Rio de Janeiro state coast. The first oil for both FPSOs is scheduled for 2014.
Following a competitive tender to Aker Solutions, KKI received an order to supply 12 globe and anti-cavitation butterfly valves for P-58. The valves ranged in size from 4” to 12” and all were ANSI 300 rated. The butterfly valves are also 6 shutoff.

P-58 and P-62 FPSO Projects for Aker Solutions